Cryogenic Storage Tank for Lo2/Ln2/Lar

Cryogenic Storage Tank for Lo2/Ln2/Lar/Lco2/LNG

Code &Standard TSG21-2016 Supervision Regulation On Safety Technology Of Stationary Pressure Vessels
Pressure Vessels(GB/T150.1150.4-2011)
GB/T18442.118442.6-2019 Stationary Vacuum Insulated Cryogenic Pressure Vessels (Reference
Basic   Data
  Inner Vessel Outer Vessel   Tank
Design Pressure MPa 2.30 -0.1 Tank Classification
Working Pressure       MPa ≤2.20 -0.1 Filling Medium Lo2,LN2,LAr
Design Temperature      -196 50 Medium Characteristics Non-Toxic    And    Non-Flammable
Working Temperature     `-196 `-20~50 Effective Volume M3/Filling Rate Based on customized
Volume          m3 customized 5.97(Interlayer) Leak Rate of  Vacuum Interlayer Pom3/s ≤5X10-8
Pneumatic Test Pressure
Before Suit)    MPa
2.64   Leak And Out gassing Rate Pam3/s ≤5X10 -6
Static-evaporation Rate %/D ≤0.23(LN2)
Leakage Test Pressure MPa Air Tightness 2.30 Helium Leak Detection Sealing Vacuum  Pa ≤0.02Pa
Material Cf Main Pressure Parts SS30408 Q345R Earthquake Intensity       Seven Degrees (0.15G)
Filling Weight         Kg customized Basic Wind Pressure KN/m2 0.35
Equipment Net Weight   Kg customized Basic Snow Pressure KN/m2 DON'T Consider
Design Expected Service Life Year    20  
Design   Data
Corrosion Allowance mm 1.0 0 Safety

Valve
Set Pressure Of Main

Safety Valve MPa
2.30
Welded Joint Coefficient 1.0 0.85
Nominal/Minimum Forming

Thickness Of Head mm
customized customized Set Pressure Of Auxiliary

Safety Valve MPa
 
Nominal/Minmum Forming

Thickness Of Vessel mm
customized customized Safety Valve Specification/Model DA22F-40P(25C1)/15mm
Safey Valve Connection Type Threaded Connection
Calculated Thickness Of Head mm customized customized Pressure

Gauge
(No Oil)
Model Y0-100
Calculated Thickness Of

Vessel         mm
customized customized Measuring Range 0-4MPa
Accuracy Not Lower Than 1.6
Insulation Method High Vacuum Multilayer Insulation Connection Type Threaded Connection
Insulation Layer Thickness mm 25

 

Manufacturing    Inspection    And    Acceptance
Material Requirement|S The Plate Of Inner Vessel Shall Comply With GB/T24511-2017.The Plate Of Outer Vessel Shall

Comply With GB/T713-2014,And The Pipe Fittings Shall Comply With GB/T14976-2012
Material Inspection And

Re-Inspection
If The Inner Vessel Is Made Of Stainless Steel Plate,The Material Shall Be Re-Inspected

According Toni GB/T150.4-2011
Welding Procedure NB/T47015-2011 Heat treatment  
Welded Joint Type Unless Otherwise Specified,The Fully Welded Structure Is Adopted,And The Groove Form And Size(An

Be Made According To HG/T20583-202O Or The Welding Process Specification Of The Manufacturer
Orientation Of Pipeline And Leg According To This Drawing Panting,Packaging And Transportation NB/T10558-2021
Product Welding Test Piece 一                    一
Select Welding Materials According To-NB/T47015-2011 And Its Qualified Welding Process
Connection   Joint   Table
Non-destructive testing of welded joints Connection   Joint   Table Method--Detection rate Standards and levels
Inner Vessel Type A,B 100% Ray Detection  NB/T47013.2-2015,ⅠGrade
 NB/T47013.11-2015,ⅠGrade
Type A,B,C,D,E 100% Osmosis detection NB/T47013.5-2015,Grade
Type B(folding joint) 100% Ray Detection  NB/T47013.2-2015, ⅡGrade
Outer Vessel Type A,B 20% Ray Detection  NB/T47013.2-2015,ⅢGrade
 NB/T47013.11-2015,ⅢGrade
Type C,D 100% Magnetic Particle Testing NB/T47013.4(5)-2015,ⅠGrade
Cylinder final ring weld 100% Magnetic Particle Testing NB/T47013.4(5)-2015,ⅠGrade

Technical Requirement

1.The Product Shall Comply With TSG 21-2016 Supervision Regulation On Safety Technology Of Stationary Pressure Vessels And GB/T150.1~150.4-2011 Pressure Vessels;

2.The Oxygen Content Of The Container And Pipeline Shall Not Be Higher Than 3%;

3.100%Magnetic Particle(Penetrant)Testing Shall Be Carried Out For Class C And D Welds Of The Shell,100%Internal And External Surface Testing Shall Be Carried Out According To The Requirements Of The Manufacturing Process For Internal And External Surface Testing,And 100%External Surface Testing Shall Be Carried Out For Welds That Cannot Be Subject to Internal Surface Testing,And The Testing Position Shall Be Indicated In The Flaw Detection Report;

4.The Coaxiality Between The Shell And The Contents Shall Be5mm

5.The Primer Is Quick-Drying Epoxy Paint,With Dry Film Thickness140mm,Semi-Gloss Acrylic Pol yurethane Paint Is Used As the Finish Paint,With Dry Film Thickness75mm.Total Dry Film Thickness>215mm;

6.The Cryogenic Liquid Storage Tank Must Use The Pressure Pipe Components Produced By The Licensed Unit;

7.Purchased Parts Shall Meet The Requirements Of GB/T18442.2-2019;

8.When Purchasing Safety Valves,Pressure Gauges,Etc.,They May Be Different From The Models In The Table,But The performance Shall Comply With The Requirements In The Table;

9.Dust Protection Of All External Interfaces Shall Meet The Requirements Of GB/T18442.4-2019;

10.After The Completion Of The Product,The Inner Container And Pipeline Shall Be Pressurized With Dry Nitrogen To 0.03~0.05Mpa For Sealing,And The Dew Point Of Nitrogen Shall Be Lower Than -25 c;

 